- Our added value
OUR DAILY MISSION: MEETING YOUR CHALLENGES
At Plastic Age, achievements are more than one-time wins; they’re milestones in a larger vision. Each day, our teams improve, optimize, and innovate alongside our clients. Whether in engineering, production, or logistics, we put our expertise to work, delivering real, tangible solutions
Here are a few examples, grouped under four key pillars that highlight our real-world impact.
Part Cost Reduction
REDUCING COSTS FROM THE START
Involving our engineering team from the early stages of a project allows us to propose concrete solutions to reduce a product’s overall cost.
CONSOLIDATING TO IMPROVE MANUFACTURING
For one client, we successfully replaced a 9-part assembly with a single molded piece. The result: a significant reduction in production and tooling costs — not to mention the elimination of assembly expenses.
OPTIMIZING EVERY DESIGN
We have also revised multiple part designs to improve production speed, reduce weight, and enhance quality—both for existing and new products.
Reduction of costs related to non-quality
Reduction of Costs Related to Non-Quality
Zero Defects — Over a million parts
We received the “Gold Award” from a major Quebec client for delivering over one million parts with zero non-conformities (0 PPM) for more than a year.
Integrated training system
We have implemented a video training system accessible at every workstation. The result: clear and consistent work methods, better adherence to quality standards, and fewer non-conformities.
REDUCING STORAGE NEEDS FOR OUR CLIENTS
Tailored logistics to meet your needs
We deliver on time, every day, to multiple clients. We maintain their parts inventory based on order history and sales forecasts, which reduces their storage needs.
Comprehensive coordination of inputs
We plan and coordinate all inputs required for the assembly and molding of products, whether supplied by the client or by us, to prevent any supply interruptions.
Better understanding of our clients needs
AN EXPERIENCED TEAM
Our team’s average seniority exceeds 15 years across all departments.
DIRECT COMMUNICATION
Our clients interact directly with our project managers, quality team, and production experts.
A LONG-TERM PARTNERSHIP
With a very low turnover rate, the same people follow projects year after year. The result: deep and lasting knowledge of our clients’ needs and products.
At Plastic Age, delivering results is a daily commitment.
All projects are the result of close collaboration, a deep understanding of the challenges, and a constant drive to do better.
Do you have a challenge to overcome? A goal to achieve? Let’s talk. Together, let’s transform your ideas into concrete solutions.